
KNX integration of Charging Points + DLM
KKNX/TP, Switch (2xRJ45), 2TE/DU 1x Modbus RTU
Casserole in the oven? Laundry in the dryer? And charge the car at the same time? It’s all possible thanks to dynamic load management (DLM)! Despite high power-consuming appliances, charging is now also possible even with small household connections. The available electricity is evenly distributed to all charging points, preventing the household connection from becoming overloaded.
The ability to coordinate up to five charging points from different manufacturers per gateway and to prioritise one specific charging point is also guaranteed to impress in the business world.
-Dynamic load management (DLM)
-Support for 5 charging points
-Different manufacturers and mixed operation
-Connection via IP or RS485 (Modbus)
-Configuration via ETS
-2 HPs in control cabinet without additional adapter
- Art.nr: 1-000F-003